Bathroom quotes vary by a factor of three for rooms that look identical in a photograph. The difference is rarely the tiles. It is what sits behind them: the condition of the pipework, whether the floor needs levelling, how the waste is routed and whether the waterproofing is done as a system or as an afterthought. This guide breaks the budget into the parts that actually drive the price.
What a bathroom costs by size
A small ensuite of 3 to 4 square metres, kept in the same layout, runs about $9,000 to $14,000. A family bathroom of 5 to 7 square metres with a bath, separate shower and double vanity lands between $16,000 and $24,000. A master ensuite of 8 to 10 square metres with a wet room and bespoke joinery can pass $30,000.
Those ranges assume a mid-range specification: porcelain tiles, branded brassware, a wall-hung vanity and a glass screen. Move to large-format slabs, a freestanding bath and concealed thermostatic valves and add 30 to 50 percent. Keep the existing layout and the existing pipe runs and you can save $2,000 to $4,000 on labour alone.

The single biggest variable is not the finish. It is whether the room is stripped back to brick and joist, or whether new fittings are laid over old surfaces. A proper remodel removes everything, inspects the timber, replaces the waste pipe and builds back with a continuous waterproofing membrane. A cosmetic refit does not, and it usually shows within three years.
Line-by-line budget
Strip-out and disposal
Expect $800 to $2,000. This covers removing tiles, sanitaryware, the old suite and floor coverings, plus skips and protection of the route to the door. If the bathroom is upstairs and access is tight, add labour for carrying everything down.
Plumbing and electrics
First fix for a like-for-like replacement costs $1,500 to $3,000. Moving the toilet or bath adds $800 to $2,500 because waste pipes need fall and cannot run uphill. A new consumer unit spur, extractor fan and heated towel rail wiring adds $600 to $1,200. Any electrics inside a bathroom must be on RCD protection and installed by a competent electrician.

Waterproofing
This is the line cheap quotes leave out. A painted membrane or tanking kit for a shower area costs $250 to $700 in materials and labour. A full wet-room system with linear drain, sloping screed and sealed corners costs $1,500 to $3,500. Do not skip it: the repair cost for a failed shower tray usually includes the ceiling below.
Tiling and finishes
Wall and floor tiling runs $45 to $120 per square metre in labour, plus tiles at $25 to $150 per square metre. Large-format porcelain needs a flatter substrate and more cutting, which pushes labour toward the top of the range. Grout and silicone are consumables, but the quality of both determines how the room looks in five years.
Sanitaryware and brassware
A mid-range suite — close-coupled toilet, wall-hung vanity, mixer tap and shower set — costs $1,200 to $3,500. Branded thermostatic valves and a decent shower tray account for most of the upper end. Buy the valve before the tiling starts; changing it later means opening the wall.

Where budgets go wrong
The first trap is the moving layout. Every fixture you relocate adds drainage, supply and often structural work. A toilet moved two metres can cost more than the toilet, the vanity and the tiles combined. Keep the wet wall where it is unless the room genuinely does not work.
The second trap is the hidden substrate. Older bathrooms often have chipboard flooring that has swelled, joists that need sistering, or a screed that is not level. Allow 10 to 20 percent of the budget for what is under the floor, and agree in writing how variations will be priced before work starts.
"A bathroom is 20 percent visible finish and 80 percent what you cannot see once the tiles are on."
How to compare quotes
Ask every contractor for the same breakdown: strip-out, plumbing, electrics, waterproofing, tiling, sanitaryware, decoration and waste removal. A single lump sum cannot be compared, and it hides the omissions that become variations. Check whether the quote includes VAT, skip hire, making good and the final clean.
Ask what happens if the floor is not level or the waste pipe is broken. A good builder gives a day rate and a written variation process. A bad one quotes low, then explains the problem after the old suite is in the skip. For the wider sequence of a renovation, see our open-plan renovation guide.
Worth paying for, worth skipping
Pay for waterproofing, ventilation and good brassware. An extractor fan sized to the room and ducted outside prevents the mould that ruins a beautiful finish. A thermostatic shower valve keeps temperature stable and protects children from scalding. These are cheap relative to the damage they prevent.
Skip the freestanding bath if nobody in the house takes baths, and skip the niche if it complicates waterproofing. A well-planned 4-square-metre shower room beats a badly planned 8-square-metre spa every time. If storage is the real problem, read our small bathroom layout guide before choosing fittings.
The bottom line
Budget $900 to $2,200 per square metre, add a fifth for the hidden layer, and fix every fixture position before demolition. Keep the layout, spend on waterproofing and ventilation, and put the specification in writing. Do that and the bathroom you get will still be the bathroom you wanted in 2036.